13th April 2016


Keisby A.D. Plant

Keisby is a 165kW AD Plant based in Bourne, Lincolnshire. The plant has been designed to accommodate whole crop rye as its feedstock. It is currently being fed around 8.5 tonnes a day.
The plant successfully passed its performance trial in January 2016.

 

Over the last 6 months, the plant has been running at 92% electrical output, generating over 6710,000 kW/h of electricity; with a 98% CHP run time.

 

[Last updated on 8th December 2016]

 

AD4Energy0115

Back »